Powering the Network. Building the Future.

TEXAS

OREGON

MW online

15 MW

Power deployed

480.2 PH/s

Additional MW

20 MW (2025)

Rio Grande City, TX

A power farm operated by our teams, starting with 15 MW and expanding to 35 MW by 2026, dedicated to both self-mining and Bitcoin hosting.

Operational miners

4,831

Power Type

Grid

Cooling Solution

 Air cooled

Rockdale, TX

A power farm designed and built by our teams, currently operating at 10 MW and expanding to 20 MW by mid-2026, dedicated to Bitcoin self-mining. From 2026 onward, the site will also host modular GPU-powered data centers.

MW online

10 MW

Power deployed

547 PH/s

Additional MW

10 MW (Q2 2026)

Operational miners

2,400

Power Type

Grid

Cooling Solution

 Air cooled

Moore, TX

Our 2 MW pilot power farm, dedicated to Bitcoin mining hosting, also integrates our future repair and storage center. From 2026, the site will expand to host modular GPU powered data centers.

MW online

2 MW

Power deployed

81 PH/s

Additional MW

Under review

Operational miners

680

Power Type

Grid

Cooling Solution

 Air cooled

Thorndale, TX

Our next power farm will be built in two phases of 15 MW each, with completion scheduled for the end of 2025 and 2026.

MW to be energized

15 MW (end 2025)

Power deployed

1,621 EH/s

Additional MW

15 MW (end 2027)

Operational miners

5 670

Power Type

Grid

Cooling Solution

Immersion

Wescalo, TX

Our upcoming 15 MW power farm, set for commissioning in 2026, will feature immersion cooling technology to deliver higher efficiency and reduced noise levels.

MW to be energized

15 MW (Q2 2026)

Power deployed

810 PH/s

Additional MW

Under review

Operational miners

2 835

Power Type

Grid

Cooling Solution

Immersion

Wuliger, TX

Our upcoming 12 MW power farm, scheduled for commissioning in 2026, will be equipped with our next-generation immersion cooling system.

MW to be energized

12 MW (Q1 2026)

Power deployed

648 PH/s

Additional MW

Under review

Operational miners

2 268

Power Type

Grid

Cooling Solution

Immersion

Athens, TX

Our 10 MW power farm, set for commissioning in 2026, will feature our next-generation immersion cooling system, with an additional 50 MW of capacity planned for deployment in 2027.

MW to be energized

10 MW (Q2 2026)

Power deployed

3,243 EH/s

Additional MW

50 MW (Q2 2027)

Operational miners

11 340

Power Type

Grid

Cooling Solution

Immersion

Prineville, OR

Our 4 MW power farm, scheduled for commissioning in 2026, will be dedicated to AI and strategically located near the Meta and Apple data centers.

MW to be energized

4 MW (Q2 2026)

Power deployed

214,5M tokens

Additional MW

under review

Operating GPUs

3 300 GPU

Power Type

Grid

Cooling Solution

 Air cooled

Accelerating the energy transition and enhancing grid flexibility by optimizing consumption.