Powering the Network. Building the Future.
TEXAS
OREGON
MW online
15 MW
Power deployed
480.2 PH/s
Additional MW
20 MW (2025)
Rio Grande City, TX
A power farm operated by our teams, starting with 15 MW and expanding to 35 MW by 2026, dedicated to both self-mining and Bitcoin hosting.
Operational miners
4,831
Power Type
Grid
Cooling Solution
Air cooled
Rockdale, TX
A power farm designed and built by our teams, currently operating at 10 MW and expanding to 20 MW by mid-2026, dedicated to Bitcoin self-mining. From 2026 onward, the site will also host modular GPU-powered data centers.
MW online
10 MW
Power deployed
547 PH/s
Additional MW
10 MW (Q2 2026)
Operational miners
2,400
Power Type
Grid
Cooling Solution
Air cooled
Moore, TX
Our 2 MW pilot power farm, dedicated to Bitcoin mining hosting, also integrates our future repair and storage center. From 2026, the site will expand to host modular GPU powered data centers.
MW online
2 MW
Power deployed
81 PH/s
Additional MW
Under review
Operational miners
680
Power Type
Grid
Cooling Solution
Air cooled
Thorndale, TX
Our next power farm will be built in two phases of 15 MW each, with completion scheduled for the end of 2025 and 2026.
MW to be energized
15 MW (end 2025)
Power deployed
1,621 EH/s
Additional MW
15 MW (end 2027)
Operational miners
5 670
Power Type
Grid
Cooling Solution
Immersion
Wescalo, TX
Our upcoming 15 MW power farm, set for commissioning in 2026, will feature immersion cooling technology to deliver higher efficiency and reduced noise levels.
MW to be energized
15 MW (Q2 2026)
Power deployed
810 PH/s
Additional MW
Under review
Operational miners
2 835
Power Type
Grid
Cooling Solution
Immersion
Wuliger, TX
Our upcoming 12 MW power farm, scheduled for commissioning in 2026, will be equipped with our next-generation immersion cooling system.
MW to be energized
12 MW (Q1 2026)
Power deployed
648 PH/s
Additional MW
Under review
Operational miners
2 268
Power Type
Grid
Cooling Solution
Immersion
Athens, TX
Our 10 MW power farm, set for commissioning in 2026, will feature our next-generation immersion cooling system, with an additional 50 MW of capacity planned for deployment in 2027.
MW to be energized
10 MW (Q2 2026)
Power deployed
3,243 EH/s
Additional MW
50 MW (Q2 2027)
Operational miners
11 340
Power Type
Grid
Cooling Solution
Immersion
Prineville, OR
Our 4 MW power farm, scheduled for commissioning in 2026, will be dedicated to AI and strategically located near the Meta and Apple data centers.
MW to be energized
4 MW (Q2 2026)
Power deployed
214,5M tokens
Additional MW
under review
Operating GPUs
3 300 GPU
Power Type
Grid
Cooling Solution
Air cooled